Plathera Gate Review

Infrastructure for capital project truth.

The operating layer between fragmented project systems and the leaders who have to act on what they contain: evidence, packages, milestones, costs, risks, and decisions.

PLATHERA01 / CATEGORY

The Problem

Every capital team has a second job: reconstructing the project before it can manage the project.

Example: RFI-118 changes DWG-SK-42, exposes PO-7742, and moves SCH-W32.
PROJECT TRUTH02 / RECONSTRUCTION TAX

Three Bottlenecks

Data Access

State is scattered across ACC, Aconex, P6, SAP, Outlook, SharePoint, vendors, and meetings.

Context Synthesis

Relationships between RFI-118, DWG-SK-42, PO-7742, and PKG-MEP-03 live in heads and side channels.

Admin Offload

Review prep consumes the week before DEC-204 can be defended.

One Required Layer

A live program model that structures the record before the EPC Assistant acts on it.

PLATHERA MODEL03 / BOTTLENECKS

Operating Layer

Decision Outputs / gate packet / DEC-204 EPC Assistant / checks / drafts / assembles Live Program Model / PKG-MEP-03 / SCH-W32 / owner action Project Graph / RFI-118 to DWG-SK-42 to PO-7742 Evidence Intake / documents / schedules / costs / correspondence Source Systems / ACC / P6 / SAP / Outlook / Aconex
STRUCTURE BEFORE ANSWERS04 / ARCHITECTURE

Roadmap Surfaces

Implemented

ACC document intake and P6 schedule sync share one subdued treatment.

Implemented

RFI and submittal extraction uses the same peer surface.

Current

PKG-MEP-03 constraint review receives signal amber rule or label.

Forthcoming

Automated turnover packet assembly can use an inverse surface.

STATUS HAS STRUCTURE05 / SURFACES

Close

Not another place to put project information. A more defensible way to know what the project is.